CNG MOTHER STATION PROGRAMME

CNG mother station is built within the location which has natural gas pipelines, and it will deliver the gas directly from ng pipelines network. Natural gas first enters into compressor units through desulfurizing pressure regulating, metering, filtering and dewatering processes etc. then the natural gas is delivered to compressors for compressing. Cooling and purifying and the pressure ng can be reached 25mpa. Finally the natural gas can be filled into high pressure trailers via filling poles, and it is also filled into automobiles via dispensers.

Brief Introduction

key facilities:Pressure regulating & metering equipment for gas inlet filtering,desulfurizing tower,dewatering device,piston reciprocating compressor,priority panel,CNG cylinder group,dispenser,filling pole,CNG trailer and gas alarming device etc.

Floor Area: about 2000m2
Suitable scale :> 20000Nm3/d
Equipment installation period: about 30 days

COMPRESSOR FOR DAUHTER STATION

CNG station is built within the location which has natural gas pipelines, and it will reserve the gas to daughter station trailers from CNG mother station then after discharging through discharging poles. The natural gas will be filled into automobiles via dispensers.

Brief Introduction
   
    Key facilities: discharging pole, piston reciprocation compressor, priority panel, cylinder group, dispenser, gas alarming device and CNG trailer etc.
Floor Area: 1000-1500m2    
Operation mode: after natural balance, first gas inlet, then compressing, boostion.
Total power :> 90kw when average operational capability is over 1000Nm3        
Variation range of compressor capacity which is accompanied by the pressure drop of trailer: 1800-400Nm3 /d
Residual gas of trailer: Residual Pressure<800Nm3  
Equipment installation period: about 20 days

 

CNG MOTHER STATION PROGRAMME

CNG mother station is built within the location which has natural gas pipelines, and it will deliver the gas directly from ng pipelines network. Natural gas first enters into compressor units through desulfurizing pressure regulating, metering, filtering and dewatering processes etc. then the natural gas is delivered to compressors for compressing. Cooling and purifying and the pressure ng can be reached 25mpa. Finally the natural gas can be filled into high pressure trailers via filling poles, and it is also filled into automobiles via dispensers.

Brief Introduction

key facilities:Pressure regulating & metering equipment for gas inlet filtering,desulfurizing tower,dewatering device,piston reciprocating compressor,priority panel,CNG cylinder group,dispenser,filling pole,CNG trailer and gas alarming device etc.

Floor Area: about 2000m2
Suitable scale :> 20000Nm3/d
Equipment installation period: about 30 days